Welcome to your local, Plumbing, Heating & Gas Company






7 Years parts & Labour on  selected models
Having Winter
Problems

CLICK HERE



 Like us on facebook

Follow us on twitter


Linkenden

View
Gallery


CLICK HERE
 * * * Full 12 months guarantee on all works carried out * * *

 

   

September 2014

Removal of an existing floor mounted open vented boiler & cylinder which was
replaced with a new Ideal Logic + 30 KW combination boiler complete with a 7 year
parts and labour manufacturers warranty, note the magnaclean unit in place which
will maintain system cleanliness and which will prolong the life of  the boiler.

-------------------------------------------------------------------------------------------

  
  

September 2014

Removed the existing warm air hot water heater which had been split due to
overheating, the heat exchanger had blocked up and was also showing signs 
of spillage. The warm air unit was fully stripped, cleaned & then put back
together ensuring that the appliance was operating safely & correctly. 

It is highly likely that this was caused by poor maintenance of the appliance.

-------------------------------------------------------------------------------------------

   
   
   

August 2013

Removed an existing warm air & hot water heater which contained asbestos flues,
the flues were removed by an approved asbestos contractor prior to the removal
of the heaters themselves. Once the heaters had been removed, a full heating
system was installed throughout the property, the system was then cleaned &
then a magnaclean unit left in place to maintain system cleanliness.

--------------------------------------------------------------------------------------------

   

July 2013

Removed an existing Glow worm combination boiler that had leaked internally
causing irreversible damage to the boiler, this was removed & a new IDEAL
LOGIC + 24KW condensing boiler fitted in its place. 

------------------------------------------------------------------------------------------

 
  

June 2013

Removal of an existing floor mounted system boiler and re-positioning the new
boiler into the property, the condensate was run externally to a soakaway and the
existing flue hole bricked up, the boiler comes with a manufacturers 5 year parts
& labour warranty, the magnaclean unit is fitted to ensure system cleanliness
throughout the life of the boiler. The gas was extended from the garage through
the new boiler position, the existinder cylinder & existing was newly lagged also.

-------------------------------------------------------------------------------------------------

   

June 2013

Removal of an existing flush mounted thermostatic shower unit which was then
replaced with a new surface mounted unit, the area was then re-tiled to provide
the finish required.

-------------------------------------------------------------------------------------------

   

May 2013

Removal of an existing wall mounted open vented boiler & cylinder which was
replaced with a new Ideal Logic + combination boiler complete with a 5 year part
and labour manufacturers warranty, note the magnaclean unit in place which
will maintain system cleanliness and which will prolong the life of  the boiler.

-----------------------------------------------------------------------------------------------

   

April 2013

Removed an existing Vaillant combination boiler that was failing intermittently
and replaced it with a new Worcester Bosch 30KW condensing boiler, note the 
magnaclean unit below the boiler which remains in place to maintain system
cleanliness, (power flushing / chemical cleaning) should always be carried out
as part of the works when installing a new boiler / heating system.

--------------------------------------------------------------------------------------------

   

   

January 2013

Removed an existing Glow worm combination boiler that had failed completely
and replaced it with a new IDEAL LOGIC + 30KW condensing boiler, NOTE the 
debris removed via the cleaning process, it is these harmful deposits within the
heating system that cause the most harm to boilers, cleaning of a heating system
(power flushing / chemical cleaning) should always be carried out as part of the
works when installing a new boiler / heating system.

------------------------------------------------------------------------------------------ 

 

   

   

January 2013

Removed an existing IDEAL ISAR combination boiler and replaced with a 
IDEAL LOGIC + combination boiler with 7 years parts & labour warranty.

-----------------------------------------------------------------------------------

 

   

Sept 2011

Due to new legislation which has recently come into force, there is now a
a need to install inspection hatches wher the flue for the boiler is either located
within a ceiling void or space in which the flue passes through. Legislation now
states that the entire flue must be visible for inspection, if this is not the case
then from December the 31st 2012 the appliance will be shut off.

------------------------------------------------------------------------------------------

 

   

 

August 2012

The above 24CDI combination boiler was found to be 11KW overgassed, due to
this, the boiler had been damaged internally, the boiler was replaced with an
IDEAL Logic + 24KW combination boiler with 7 years parts and labour warranty.

-----------------------------------------------------------------------------------

    

June 2012

The above boiler had a heavily leaking and corrosing expansion vessel, the flue
was removed to gain access to the existing expansion vessel so it could be removed
and then replaced withthe new one, a combustion analysis was then caried out to
confirm that the flue was re-installed correctly and that the boiler was operating
correctly.

--------------------------------------------------------------------------------------

   

June 2012

The installation of a Worcester Bosch 30SI combination boiler in place of an existing open flued back boiler unit, the above boiler also has a manufacturers 7 year parts and labour warranty in place.

--------------------------------------------------------------------------------------- 

   
   

June 2012

Removal of existing bath due to a poor installation, the area was then re-boarded and a
frame was then put in place to support the bath, the area around the bath was then re-sealed
and then a front bath panel fitted in place.

-------------------------------------------------------------------------------------------------------

   

   

May 2012

This property is a new build which was completed over 8 months, we carried out the complete plumbing works, central heating and completed the full electrical installation throughout, all the relevent documents issued and local authority informed.

-------------------------------------------------------------------------------------

  

May 2012

Removal of an existing wall mounted open vented boiler & cylinder which was replaced

with a new Worcester Bosch 30CDIC heat only boiler and a 250litre indirect unvented

cylinder, both the heating and DHW circuits were then sealed to create a sealed system.

--------------------------------------------------------------------------------------------------------

     

April 2012

Removal of an existing floor mounted system boiler and an inefficient indirect cylinder, 
a new 30 CDI heat only Worcester Bosch with 5 years parts and labour warranty, also
new more energy efficient pre lagged indirect cylinder.

--------------------------------------------------------------------------------------

    

    

March 2012

Removal of an existing wall mounted open vented boiler & cylinder which was replaced
with a new Worcester Bosch 40CDIC heat only boiler and a 250litre indirect unvented
cylinder, both the heating and DHW circuits were then sealed to create a sealed
system.

--------------------------------------------------------------------------------------- 

    

 

March 2012

Removal of an existing wall mounted combi and replaced with a 25SI Worcester Bosch
with 5 years parts and labour warranty.

--------------------------------------------------------------------------------------

    

March 2012

The removal of all existing radiators and the installation of new stelrad softline style

radiators and thermostatic valves.

--------------------------------------------------------------------------------------

     

March 2012

Works carried out to an Ariston combination boiler, replaced the Pressure relief

valve, the pressure gauge & repressurised the expansion vessel.

-------------------------------------------------------------------------------

                     

March 2012

The removal and replacement of an integral circulating pump on a combination boiler.

-------------------------------------------------------------------------------------

     

Febuary 2012

The removal of a system boiler and gledhill storage tank which was replaced by a

Worcester Bosch 30SI combination boiler with a 5 year manufacturers parts and labour warranty

-------------------------------------------------------------------------------------------------------

     

December 2011

The removal of an existing solid fuel back boiler unit which was replaced with an open flued

decorative inset fire, hearth and wooden surround.

--------------------------------------------------------------------------------------------------------

    

September 2011

The removal of an existing floor standing heat only boiler which was upgraded to a new

Worcester Bosch heat only boiler with 5 years parts and labour warranty.

-------------------------------------------------------------------------------------------------------

    

   

   

August 2011

The removal of an existing bathroom suite and then a complete refurbishment.

--------------------------------------------------------------------------------------------------------

    

July 2011

The removal of an existing Glow worm heat only boiler which was replaced with a
Worcester Bosch RI model.

--------------------------------------------------------------------------------------------------------

     

July 2011

The removal of a Biasi combinaton boiler and replaced with a new Ideal 24KW Logic +
combination boiler with 5 years parts and labour warranty.

--------------------------------------------------------------------------------------------------------

                      

May 2011

Lack of boiler servicing lead to this appliance having to be replaced.

-------------------------------------------------------------------------------- 

Loughton, Debden, Buckhurst Hill, Chigwell, Epping, Abridge, Barkingside, Theydon Bois, Harlow, Ongar, Woodford, Chingford, Ilford, Romford,

Hutchison Heating, Hutchinson, Loughton, Debden, IG10, Buckhurst Hill, IG9 Abridge, Epping, Theydon Bois, CM16, Chigwell, Barkingside, Ilford, Romford, Ongar, Harlow, Woodford, Bridge, Green, Romford, Ilford, Barkingside, Plumbing, Plumber, Heating, Gas, Electrical, IG10, IG9, CM16, E4,